1. Enter the cash flows once, then choose NPV or IRR
On the BA II Plus™, press CF to enter the money paid and received. For net present value, press NPV, enter the required return in I, press ENTER, then ↓ CPT. For internal rate of return, the rate is the unknown. With the same cash flows in memory, press IRR CPT.
- Open
CF, then press2ND [CLR WORK]. CLR WORK is printed above the CE/C key. Opening CF first makes sure you clear the cash flows from the previous question. - At
CF0, enter the cash flow today and pressENTER. For money paid out, type the amount and press+/−before you store it. Time zero has no frequency field. - Press
↓forC01, enter the first future amount, then pressENTER ↓forF01. The frequency starts at one. Change it only if the same amount occurs in consecutive periods. Continue down to enter any later flows. - For NPV, press
NPV. AtI, enter the discount rate per cash flow period as a percentage. PressENTER ↓ CPT. Read the result in the currency used for the cash flows. - For IRR, press
IRR CPT. Read the result as a percentage per cash flow period. With year-end amounts one year apart, the display gives an annual rate.
Watch the full key sequence on one project: USD 8,000 today, then three uneven receipts, NPV at 6% and the IRR (two minutes).
Before reaching for a key, mark today and the end of each period on a timeline. Write a signed amount wherever money changes hands. A quoted portfolio value can help describe a question without creating a payment on that date. The two examples below show how to tell which figures belong in CF.
2. Calculate the NPV of two project receipts
The project has an NPV of EUR 6,995.88 at 8%. It costs EUR 100,000 today and pays EUR 60,000 after tax at the end of each of the next two years. You are valuing all three amounts as of today. The cost already has today's date. The first receipt needs one year of discounting and the second needs two.
Scroll horizontally to see every column.
Advance through the five steps below. The highlighted keys show the presses for the current step. Check the field name beside the display as well as the number. At step three the display should refer to F01, the count of receipts. At step four it should refer to I, the required return.
Calculator steps
Open CF, clear the previous cash flows with CLR WORK, and store the cost as −100,000 in CF0.
- 1CF
- 22ND
- 3CE/C
- 4Input number 100000
- 5+/−
- 6ENTER
Financial calculator
Why is the answer less than the EUR 20,000 difference between receipts and cost? That difference adds amounts from three different dates. At 8%, the first receipt is worth about EUR 55,556 today and the second about EUR 51,440. Subtract the initial EUR 100,000 from their combined present value. Keep full precision until the final result, especially when an answer choice is rounded to the nearest euro.
The positive result measures the value left today after allowing for the required return. The project earns enough on these projected cash flows to cover both its cost and the investor's 8% hurdle. If the question asks what rate would leave exactly zero value today, it is asking for the IRR. That question uses the same timeline but makes the discount rate the quantity to solve for.
3. Calculate the investor's IRR after an additional contribution
The investor earns a money-weighted return of 10.0% per year. The initial purchase costs USD 100,000. A year later, the portfolio is worth USD 120,000 and the investor puts in another USD 50,000. At the end of the second year the portfolio is worth USD 176,000. Treat that last value as the amount the investor could take out.
Scroll horizontally to see every column.
At year one, only USD 50,000 crosses from the investor into the portfolio. Its quoted value of USD 120,000 is a measurement of the existing holdings. Entering it as a receipt would model a sale and give a return for a different investment. In the replay, watch the minus sign on C01, then advance past F01 to enter the positive ending value in C02.
Calculator steps
Open CF, clear the previous cash flows with CLR WORK, and store the purchase as −100,000 in CF0.
- 1CF
- 22ND
- 3CE/C
- 4Input number 100000
- 5+/−
- 6ENTER
Financial calculator
Check the answer by working forward in dollars. The original USD 100,000 growing at 10% for two years becomes USD 121,000. The later USD 50,000 grows for one year and becomes USD 55,000. Together they produce exactly the observed USD 176,000. This check also explains why the timing of a contribution matters even if the total amount invested stays the same.
A time-weighted return answers a different question. It uses the year-one valuation to separate performance before and after the contribution. Here the investor has more money exposed during the weaker second year. To see how those subperiod returns fit together, read Money-Weighted vs Time-Weighted Return.
4. Use frequency for consecutive equal cash flows
Think of each C and F pair as one instruction on the timeline. C gives the signed amount and F tells the calculator how many successive periods receive that amount. Each repetition moves the next cash flow one period farther into the future. F counts all occurrences, including the first.
For the project, C01 = 60,000 with F01 = 2 places a receipt at each of two year-ends. You could enter 60,000 in both C01 and C02 with their frequencies left at one and obtain the same NPV. Combining them into a single payment of 120,000 would assign all the money to one date and change its present value.
For the portfolio, the contribution and ending value differ in both amount and direction. Give each its own C field. The frequencies can stay at one. If a question has a period between two payments in which no money changes hands, enter a zero for that period. Omitting the period brings the following cash flow forward and discounts it for too little time.
5. Check these six entries when the answer looks wrong
- Old cash flows. Open CF and clear the worksheet before a new problem, especially when the previous timeline had more periods.
- Sign convention. Follow one party throughout, using a negative sign for cash that party spends and a positive sign for cash it receives.
- Discount rate units. Enter 8 in I for an 8% rate per period. An entry of 0.08 instructs the calculator to use 0.08%.
- Time zero. Store today's purchase in CF0 so it receives no discount, and start C01 with the first future period.
- Frequency. Count the periods represented by every F field and match the last one to the final date in the question.
- Multiple IRRs. If cash flow signs change more than once, more than one rate may make NPV zero. Use NPV at the stated required return when deciding whether a project adds value.
6. Practise without the replay
Open the financial calculator and enter one of the timelines from memory. Before pressing CPT, say whether the answer will be a currency amount or a rate per period. For settings, loan payments and other worksheets, continue with how to use the BA II Plus for CFA® Level I.
Quizara creates this guide independently. It is not official CFA Institute® curriculum material, and Quizara is not affiliated with or endorsed by CFA Institute or Texas Instruments. Product compatibility references are descriptive only. Written by Quizara under our editorial standards.